APL 5L grade B large quantity carbon steel SAW pipe for oil casing
COMPLETE PROJECT MANAGEMENT
In order to assure a smooth and on-time delivery, the "project" should be managed with utmost care and all external or unpredictable factors should be taken into consideration in advance.
Any sophisticated supply project essentially includes (but not limited to) "negotiations", "time scheduling","quality assurance", "delivery"…
However, as for a steel pipe supply project, some administrative and operational steps comes to the forefront, which naturally affects the project, such as specifying the most appropriate production and shipping plan, warehousing (if needed), organizing the inspection of the production and loading, coordinating the whole transportation process including inland hauling and handling customs clearance procedures, and tracking the transportation as well.
Production |
Spiral Welded Steel Pipe |
Brand |
RJ |
Standard/Material |
API 5L, API 5CT, SY/T5037, SY/T5040, GB/T9711.1,
GB/T9711.2, A, B, X42-X80, L175-L555,L245NB, etc.
|
Out Diameter |
159mm-3200mm |
Wall Thickness |
3mm-30mm |
Length |
5.8m-11.8m,or as customer's requirements. |
Place of Origin |
Tianjin, China |
Main Market |
Middle East,Africa,South-east Asia,USA,Canada,South America |
Technique |
SSAW , Sprially submerged arc welding |
Usage |
1. Piling project
2. Heat-supply project
3. Conveying drinking water,drainage,coal gas,fuel gas,mine slurry and other low & middle pressure fluids
4. API5L Petroleum and natural gas pipeline
5. Chemistry industry
6. Electric power engineering circulating pipe
|
Package |
1.Bundle packing or in bulk,
2. Bevelled or plain ends as per buyer's request,
3. Marks: as per customer's request,
4. Surface treatment: with or without varnish/2PP/2PE/3PE/3PP/FBE coating.
5. Metal or plastic protecting caps at pipe ends
|
Delivery Time |
about 20days after receipt of irrevocable L/C at sight or 30% deposit T.T |
Other products |
1. Spiral welded steel pipe
2. LSAW steel pipe
3. ERW steel pipe
4. Casing pipe
|
External Coating |
FBE, 2PE, 3PE,3PP etc. |
Pipe end |
Plain end, beveled end, PVC covered and both ends capped ,threaded and coupled |